Dufferin St at Rogers Rd
Toronto-TMC: The intersection blocked due to a collision
- Listed dates
- → No end supplied
- Work period
- Continuous · Everyday 00:00-23:59
Record updated · Official restriction map ↗
Find reported lane restrictions, construction and upcoming work before you set out.
A restriction can affect part of a road or a single lane. It does not necessarily mean the entire street is closed.
City data retrieved . The latest refresh failed; this is the last available snapshot. Reload this page for the latest available information.
“Impact reported” includes records within their start and end dates with a reported high, medium or low impact. For upcoming work, the impact filter uses the maximum impact reported for the project. Daily work hours can still vary. Always check the schedule below.
This feed is delayed or unavailable. These are saved records, not confirmation of current road conditions.
Showing the first 50 matches. Search a street or district to narrow the list. Higher reported impacts appear first.
Toronto-TMC: The intersection blocked due to a collision
Record updated · Official restriction map ↗
Toronto-TMC: Northbound left lane is opened and right two lanes are remain blocked.
Record updated · Official restriction map ↗
Toronto-TMC: Road closed due to the TIFF.
Record updated · Official restriction map ↗
Toronto-TMC: Road closed due to the TIFF.
Record updated · Official restriction map ↗
Toronto-TMC: Road closed due to the TIFF.
Record updated · Official restriction map ↗
Toronto-TMC: Road closed due to the TIFF.
Record updated · Official restriction map ↗
Toronto-TMC: Road closed due to the TIFF.
Record updated · Official restriction map ↗
Toronto-TMC: Road closed due to the TIFF.
Record updated · Official restriction map ↗
Toronto-TMC: TTC - Bus Stops Group 23
Record updated · Official restriction map ↗
Toronto-TMC: 13 Storey mixed use building, with Retail/Commercial at grade, underground parking, 9 storey office tower and residential condominium.
Record updated · Official restriction map ↗
Toronto-TMC: Bus Stop Improvements – Group 23
Record updated · Official restriction map ↗
Toronto-TMC: TTC - Bus Stops Group 23
Record updated · Official restriction map ↗
Toronto-TMC: short term Catch Basin relocation work. Day Works
Record updated · Official restriction map ↗
Toronto-TMC: Sanitary sewer main repair west of Jane st on the west side of Sheppard ave
Record updated · Official restriction map ↗
Toronto-TMC: https://www.metrolinx.com/en/projects-and-programs/eglinton-crosstown-west-extension
Record updated · Official restriction map ↗
Toronto-TMC: Construction Staging: Jane Portal (extension received).
Record updated · Official restriction map ↗
Toronto-TMC: Traffic staging for the Northwest corner of Scarlett and Eglinton - stage 2.
Record updated · Official restriction map ↗
Toronto-TMC: Traffic staging for the Northwest corner of Scarlett and Eglinton - stage 2.
Record updated · Official restriction map ↗
Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.
Record updated · Official restriction map ↗
Toronto-TMC: Installation of water service
Record updated · Official restriction map ↗
Toronto-TMC: stage 1 implementation
Record updated · Official restriction map ↗
Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.
Record updated · Official restriction map ↗
Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.
Record updated · Official restriction map ↗
Toronto-TMC: Long Duration Closure of the Parklawn Rd. North & South on ramp to the Gardiner Expressway Westbound. Closure one of the left turn lanes from the Eastbound Gardiner Expressway off ramp to Northbound Parklawn Rd.
Record updated · Official restriction map ↗
Toronto-TMC: Long Duration Closure of the Parklawn Rd. North & South on ramp to the Gardiner Expressway Westbound. Closure one of the left turn lanes from the Eastbound Gardiner Expressway off ramp to Northbound Parklawn Rd.
Record updated · Official restriction map ↗
Toronto-TMC: Long Duration Closure of the Parklawn Rd. North & South on ramp to the Gardiner Expressway Westbound. Closure one of the left turn lanes from the Eastbound Gardiner Expressway off ramp to Northbound Parklawn Rd.
Record updated · Official restriction map ↗
Toronto-TMC: Long Duration Closure of the Parklawn Rd. North & South on ramp to the Gardiner Expressway Westbound. Closure one of the left turn lanes from the Eastbound Gardiner Expressway off ramp to Northbound Parklawn Rd.
Record updated · Official restriction map ↗
Toronto-TMC: bypass plan for stage 3A
Record updated · Official restriction map ↗
Toronto-TMC: Rehabilitate and reconstruct an existing manhole roof structure that houses active steam distribution piping. The work is required to rebuild the manhole roof, access shafts, and vent shafts while maintaining the safe operation and support of the existing steam infrastructure throughout the duration of construction.
Record updated · Official restriction map ↗
Toronto-TMC: Rehabilitate and reconstruct an existing manhole roof structure that houses active steam distribution piping. The work is required to rebuild the manhole roof, access shafts, and vent shafts while maintaining the safe operation and support of the existing steam infrastructure throughout the duration of construction.
Record updated · Official restriction map ↗
Toronto-TMC: Work includes saw cut, removal of asphalt, excavation, placement of shoring boxes, installation of sewer pipes and manholes, and backfill to grade with temporary and permanent restoration
Record updated · Official restriction map ↗
Toronto-TMC: TTC Subway Vent Shaft Rehabilitation
Record updated · Official restriction map ↗
Toronto-TMC: Underground Utility Installation for Bell
Record updated · Official restriction map ↗
Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.
Record updated · Official restriction map ↗
Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.
Record updated · Official restriction map ↗
Toronto-TMC: We will be completing some curb realignment work at the corner of Bathurst Street and Lennox Street (NW Corer), which will locally impact the sidewalk and adjacent southbound curb lane on Bathurs STreet and Westbound curb lane on Lennox Street
Record updated · Official restriction map ↗
Toronto-TMC: This is for traffic signal and sidewalk./curb work
Record updated · Official restriction map ↗
Toronto-TMC: Installing new curb and sidewalks. Dates will be updated if work is completed prior to the end date.
Record updated · Official restriction map ↗
Toronto-TMC: Installing new curb and sidewalks. Dates will be updated if work is completed prior to the end date.
Record updated · Official restriction map ↗
Toronto-TMC: Installing new curb and sidewalks. Dates will be updated if work is completed prior to the end date.
Record updated · Official restriction map ↗
Toronto-TMC: 23TW-CTS-17CWD - SANITARY FORCEMAIN INSTALLATION AT HUMBER SPS
Record updated · Official restriction map ↗
Toronto-TMC: Breakout and replacement of subgrade hydro network vault LOC 4460.
Record updated · Official restriction map ↗
Toronto-TMC: Construction Staging: Mt. Dennis Portal (extension received).
Record updated · Official restriction map ↗
Toronto-TMC: Realignment of Eglinton Ave E for piling works. EEB 01 Stage 01.
Record updated · Official restriction map ↗
Toronto-TMC: The closure of the DVP On ramp from Eastern Ave is required to reconstruct a storm water management shaft within the current alignment of the DVP ramp and to construct a flood protection landform and re-build the on ramp to be incorporated into this flood protection landform.
Record updated · Official restriction map ↗
Toronto-TMC: The closure of the DVP On ramp from Eastern Ave is required to reconstruct a storm water management shaft within the current alignment of the DVP ramp and to construct a flood protection landform and re-build the on ramp to be incorporated into this flood protection landform.
Record updated · Official restriction map ↗
Toronto-TMC: Dropcurb and sidewalk under 10C
Record updated · Official restriction map ↗
Toronto-TMC: Stage transition to Stage 4B --
Record updated · Official restriction map ↗
Toronto-TMC: Stage transition to Stage 4B --
Record updated · Official restriction map ↗
Toronto-TMC: Extension - JG-3/4 worksite for ATSSE project (TBM ground improvement)
Record updated · Official restriction map ↗
The City feed contains current and planned restrictions. Start and end dates describe a record’s overall window; intermittent work may take place only during the listed hours. An open-ended record has no end time supplied. The reported impact is the source’s assessment, not a travel-time estimate.
No. These records describe reported restrictions and planned work. They do not measure traffic speeds, queues or how long a journey will take. Check the City’s official restriction map for the source information.
A street can have separate permits, locations, directions or work periods. We retain those records so a single entry does not hide a different restriction nearby. Read the location and dates for the part of the street you will use.
City of Toronto Road Restrictions. Contains information licensed under the Open Government Licence – Toronto. The source records are filtered, sorted and formatted for this page. Things Toronto does not independently verify conditions at each location.