Toronto, at a glance

Toronto road restrictions

Find reported lane restrictions, construction and upcoming work before you set out.

A restriction can affect part of a road or a single lane. It does not necessarily mean the entire street is closed.

City data retrieved . The latest refresh failed; this is the last available snapshot. Reload this page for the latest available information.

“Impact reported” includes records within their start and end dates with a reported high, medium or low impact. For upcoming work, the impact filter uses the maximum impact reported for the project. Daily work hours can still vary. Always check the schedule below.

226 matching records

Reset filters

This feed is delayed or unavailable. These are saved records, not confirmation of current road conditions.

Showing the first 50 matches. Search a street or district to narrow the list. Higher reported impacts appear first.

YORKHigh reported impact

Dufferin St at Rogers Rd

Toronto-TMC: The intersection blocked due to a collision

Listed dates
→ No end supplied
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

NORTH YORKHigh reported impact

Northbound Dufferin St at Steeles Ave W

Toronto-TMC: Northbound left lane is opened and right two lanes are remain blocked.

Listed dates
→ No end supplied
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Davenport Rd 70 m West of Bedford Rd to 98 m Northwest of Bedford Rd

Toronto-TMC: Construction of a 10-storey condominium with 4 levels of below grade parking.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Dupont St 13 m West of Franklin Ave to Franklin Ave

Toronto-TMC: Cable Chamber Roof Rebuilds

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Dupont St at Symington Ave to 11 m West of Symington Ave

Toronto-TMC: Cable Chamber Roof Rebuilds

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Dundas St W 12 m East of University Ave to University Ave

Toronto-TMC: Installation of approximately 830 m of 300 mm PVC DR18 watermain and 760 m of 600 mm welded steel watermain, including the construction of valve chambers and drain chambers, as well as associated site servicing and full surface restoration along University Avenue, from Armoury Street to College Street.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Dundas St W at University Ave to 15 m East of University Ave

Toronto-TMC: Installation of approximately 830 m of 300 mm PVC DR18 watermain and 760 m of 600 mm welded steel watermain, including the construction of valve chambers and drain chambers, as well as associated site servicing and full surface restoration along University Avenue, from Armoury Street to College Street.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

University Ave from Armoury St to Dundas St W

Toronto-TMC: Installation of approximately 830 m of 300 mm PVC DR18 watermain and 760 m of 600 mm welded steel watermain, including the construction of valve chambers and drain chambers, as well as associated site servicing and full surface restoration along University Avenue, from Armoury Street to College Street.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

University Ave from Dundas St W to College St

Toronto-TMC: Installation of approximately 830 m of 300 mm PVC DR18 watermain and 760 m of 600 mm welded steel watermain, including the construction of valve chambers and drain chambers, as well as associated site servicing and full surface restoration along University Avenue, from Armoury Street to College Street.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

College St at University Ave to 12 m East of University Ave

Toronto-TMC: Installation of approximately 830 m of 300 mm PVC DR18 watermain and 760 m of 600 mm welded steel watermain, including the construction of valve chambers and drain chambers, as well as associated site servicing and full surface restoration along University Avenue, from Armoury Street to College Street.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

YORKHigh reported impact

Eglinton Ave W 268 m West of Pearen St to 268 m West of Pearen St

Toronto-TMC: Construction Staging: Jane Portal (extension received).

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Eglinton Ave W at Scarlett Rd to 68 m West of Scarlett Rd

Toronto-TMC: Traffic staging for the Northwest corner of Scarlett and Eglinton - stage 2.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Eglinton Ave W 68 m West of Scarlett Rd to Scarlett Rd

Toronto-TMC: Traffic staging for the Northwest corner of Scarlett and Eglinton - stage 2.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

SCARBOROUGHHigh reported impact

McCowan Rd at Channel Nine Crt to 70 m South of Channel Nine Crt

Toronto-TMC: stage 1 implementation

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

NORTH YORKHigh reported impact

Eglinton Ave E 11 m Northeast of Don Mills Rd to 27 m Northeast of Don Mills Rd

Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

NORTH YORKHigh reported impact

Eglinton Ave E 62 m Northeast of Mike Palmateer Rd to 69 m Southwest of Don Mills Rd

Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Gardiner E Park Lawn Rd Ramp 34 m Southwest of Park Lawn Rd to 12 m Southwest of Park Lawn Rd

Toronto-TMC: Long Duration Closure of the Parklawn Rd. North & South on ramp to the Gardiner Expressway Westbound. Closure one of the left turn lanes from the Eastbound Gardiner Expressway off ramp to Northbound Parklawn Rd.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Park Lawn Rd at Park Lawn Gardiner W Ramp to 5 m Northwest of Gardiner E Park Lawn Rd Ramp

Toronto-TMC: Long Duration Closure of the Parklawn Rd. North & South on ramp to the Gardiner Expressway Westbound. Closure one of the left turn lanes from the Eastbound Gardiner Expressway off ramp to Northbound Parklawn Rd.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Park Lawn Rd 11 m Northwest of Park Lawn Gardiner W Ramp to Park Lawn Gardiner W Ramp

Toronto-TMC: Long Duration Closure of the Parklawn Rd. North & South on ramp to the Gardiner Expressway Westbound. Closure one of the left turn lanes from the Eastbound Gardiner Expressway off ramp to Northbound Parklawn Rd.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Park Lawn Gardiner W Ramp 15 m Southwest of Park Lawn Rd to 80 m East of Grand Ave

Toronto-TMC: Long Duration Closure of the Parklawn Rd. North & South on ramp to the Gardiner Expressway Westbound. Closure one of the left turn lanes from the Eastbound Gardiner Expressway off ramp to Northbound Parklawn Rd.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Queen St W 27 m East of Gladstone Ave to 43 m East of Lisgar St

Toronto-TMC: Upgrading THESL hydro infrastructure.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Queen St W 44 m East of Lisgar St to 29 m East of Gladstone Ave

Toronto-TMC: Upgrading THESL hydro infrastructure.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Bloor St E 26 m West of Morley Callaghan Footbridge to 104 m East of Morley Callaghan Footbridge

Toronto-TMC: TTC Subway Vent Shaft Rehabilitation

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

SCARBOROUGHHigh reported impact

Morningside Ave at Tams Rd to 28 m South of Morningside Ave N 401 C E Ramp

Toronto-TMC: Road Rehabilitation, Cycle Track & Sidewalk installation.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

YORK and TORONTOHigh reported impact

Bloor St W 9 m Northwest of Riverside Dr to 6 m East of Brule Ter

Toronto-TMC: 23TW-CTS-17CWD - SANITARY FORCEMAIN INSTALLATION AT HUMBER SPS

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

SCARBOROUGHHigh reported impact

Morningside Ave 3 m South of Tams Rd to 67 m South of Tams Rd

Toronto-TMC: Road Rehabilitation, Cycle Track & Sidewalk installation.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

SCARBOROUGHHigh reported impact

Morningside Ave 12 m South of 401 C E Morningside Ave S Ramp to Tams Rd

Toronto-TMC: Road Rehabilitation, Cycle Track & Sidewalk installation.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

YORKHigh reported impact

Eglinton Ave W 33 m East of C N R / C P R to 10 m East of Weston Rd

Toronto-TMC: Construction Staging: Mt. Dennis Portal (extension received).

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

SCARBOROUGHHigh reported impact

Eglinton Ave E 40 m West of Huntington Ave to 6 m West of Falmouth Ave

Toronto-TMC: Realignment of Eglinton Ave E for piling works. EEB 01 Stage 01.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Eastern Av E Dvp N Ramp 34 m East of Eastern Ave Diversion to 92 m South of Eastern Ave Diversion

Toronto-TMC: The closure of the DVP On ramp from Eastern Ave is required to reconstruct a storm water management shaft within the current alignment of the DVP ramp and to construct a flood protection landform and re-build the on ramp to be incorporated into this flood protection landform.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Eastern Ave Diversion 11 m East of Don Valley Parkway N to 22 m East of Broadview S Eastern W Ramp

Toronto-TMC: The closure of the DVP On ramp from Eastern Ave is required to reconstruct a storm water management shaft within the current alignment of the DVP ramp and to construct a flood protection landform and re-build the on ramp to be incorporated into this flood protection landform.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

SCARBOROUGHHigh reported impact

Eglinton Ave E 10 m East of Falmouth Ave to 16 m West of Brimley Rd

Toronto-TMC: Extension - JG-3/4 worksite for ATSSE project (TBM ground improvement)

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Dundas St W at Aukland Rd to 16 m Northeast of Hepc

Toronto-TMC: Construction of a 50-storey mixed use building. Refer to the link below for construction updates: http://kscondosconstruction.com/

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Adelaide St W 2 m West of Ln W Spadina S Adelaide to 27 m West of Ln W Spadina S Adelaide

Toronto-TMC: - The project is Underground Civil Infrastructure project. The project includes rebuilding an old vault. - The project will be executed by Entera Utility Contractors under the contract with Toronto Hydro. Cut permit have been received from City of Toronto. - Metrolinx no conflict letter has been received. - Location is 379 Adelaide St West. Construction notices has been delivered. Residents and offices around are aware of our existence on the site.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Dundas St E 2 m West of Ln W Church S Dundas to 4 m East of Ln W Church S Dundas

Toronto-TMC: 241 CHURCH ST (TO) at DUNDAS ST E to GOULD ST Installation of 375mm Storm Sever and 2 Catch basins and 3 manholes as per MIA - Along Lane West Church St Dundas to Dundas St E

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Dundas St E 2 m West of Ln W Church S Dundas to 4 m East of Ln W Church S Dundas

Toronto-TMC: 241 CHURCH ST (TO) at DUNDAS ST E to GOULD ST Installation of 375mm Storm Sever and 2 Catch basins and 3 manholes as per MIA - Along Lane West Church St Dundas to Dundas St E

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

College St 18 m East of Bay St to Carlton St

Toronto-TMC: TTC Track and sewer work on College Street from Bay Street to Church Street including Yonge/College intersection

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Carlton St from Church St to Yonge St

Toronto-TMC: TTC Track and sewer work on College Street from Bay Street to Church Street including Yonge/College intersection

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

NORTH YORKHigh reported impact

Eglinton Ave E 15 m Northeast of Don Mills Rd to 53 m Northeast of Don Mills Rd

Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

King St W 40 m West of Peter St to 4 m East of Charlotte St

Toronto-TMC: Construction staging to complete mixed use tower under construction

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

NORTH YORKHigh reported impact

Don Mills Rd 28 m North of Eglinton Ave E to 16 m South of Kyle Lowry Rd

Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Carlton St from Yonge St to Parliament St

Toronto-TMC: The Overhead crew will work on the curblane on both eastbound and westbound on College St and Carlton St between McCaul and Parliament between July 26 and Dec 31, 2026. This will be a rolling operation. Scope of Work In support of TTC's ongoing system-wide overhead infrastructure modernization program, the following work is planned during the College Street streetcar service closure: * Installation of the auto-tensioning system. * Adjustment of the contact wire stagger to meet TTC Engineering's full pantograph standards. * Installation of new section breaks and removal of redundant section break infrastructure. * Testing and commissioning of the upgraded Track and OCS infrastructure before the restoration of regular streetcar service.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

College St 4 m East of Mc Caul St to Carlton St

Toronto-TMC: The Overhead crew will work on the curblane on both eastbound and westbound on College St and Carlton St between McCaul and Parliament between July 26 and Dec 31, 2026. This will be a rolling operation. Scope of Work In support of TTC's ongoing system-wide overhead infrastructure modernization program, the following work is planned during the College Street streetcar service closure: * Installation of the auto-tensioning system. * Adjustment of the contact wire stagger to meet TTC Engineering's full pantograph standards. * Installation of new section breaks and removal of redundant section break infrastructure. * Testing and commissioning of the upgraded Track and OCS infrastructure before the restoration of regular streetcar service.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

NORTH YORKHigh reported impact

Steeles Ave W 83 m East of Don River W Branch to 111 m West of G Ross Lord Park Trl

Toronto-TMC: Working on traffic lights on eastside of intersection. Hanging overhead lights, removing traffic pole on median, as well as removing the median

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

SCARBOROUGHHigh reported impact

Finch Ave E 6 m East of Milliken Blvd to 67 m West of Midland Ave

Toronto-TMC: Construction of utilities and a grade separation for Metrolinx. Work event is for the utility relocation and caisson portion of the work that occupies the roadway

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Kipling Ave 11 m South of Bloor St W to 77 m South of Bloor St W

Toronto-TMC: The construction of the New Etobicoke Civic Centre. Multiplex Construction Canada will be managing the construction of the New Etobicoke Civic Centre Located at 3755 Bloor Street W. Etobicoke, Ontario M9A 1A2, located within the newly redeveloped Etobicoke Civic Centre Precinct (formerly the Westwood Theatre Lands). The ECC is a mixed-use building comprising a wide range of community focused program and services. The building is arranged in a series of tall volumes towards the north, housing the municipal offices, while the lower floors towards the south contain all the public functions. It will also be compliant to the Toronto Accessibility Design Guidelines (TADG) to extend greater accessibility for all users. With 508,000 square feet of accessible public-facing space, the new civic centre is the first of its kind to be built in the last 50 years and is designed as a state-of-the-art mixed-used civic hub that includes: Civic Square • Approximately 47,000 sq

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

NORTH YORKHigh reported impact

Don Mills Rd 13 m South of St Dennis Dr to 23 m North of Gateway Blvd

Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Queen's Park 31 m West of Queen's Park Cres E to 40 m West of Queen's Park Cres E

Toronto-TMC: Installing watermain on Queens Park Cr. E.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Dupont St at Campbell Ave to 74 m East of C N R

Toronto-TMC: Excavation, sidewalk demolition, duct bank installation, chamber installation, backfilling and sidewalk new works/reinstatement.

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Danforth Ave 7 m East of Ln E Pape S Danforth to 15 m West of Eaton Ave

Toronto-TMC: Traffic layout after jet grouting works at Danforth

Listed dates
→
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

What these records tell you

The City feed contains current and planned restrictions. Start and end dates describe a record’s overall window; intermittent work may take place only during the listed hours. An open-ended record has no end time supplied. The reported impact is the source’s assessment, not a travel-time estimate.

Is this a live traffic map?

No. These records describe reported restrictions and planned work. They do not measure traffic speeds, queues or how long a journey will take. Check the City’s official restriction map for the source information.

Why can a street appear more than once?

A street can have separate permits, locations, directions or work periods. We retain those records so a single entry does not hide a different restriction nearby. Read the location and dates for the part of the street you will use.

Road data source

City of Toronto Road Restrictions. Contains information licensed under the Open Government Licence – Toronto. The source records are filtered, sorted and formatted for this page. Things Toronto does not independently verify conditions at each location.

Find your next Toronto stop

A few places to start

Browse all guides & city tools