Dufferin St at Rogers Rd
Toronto-TMC: The intersection blocked due to a collision
- Listed dates
- → No end supplied
- Work period
- Continuous · Everyday 00:00-23:59
Record updated · Official restriction map ↗
Find reported lane restrictions, construction and upcoming work before you set out.
A restriction can affect part of a road or a single lane. It does not necessarily mean the entire street is closed.
City data retrieved . The latest refresh failed; this is the last available snapshot. Reload this page for the latest available information.
“Impact reported” includes records within their start and end dates with a reported high, medium or low impact. For upcoming work, the impact filter uses the maximum impact reported for the project. Daily work hours can still vary. Always check the schedule below.
This feed is delayed or unavailable. These are saved records, not confirmation of current road conditions.
Showing the first 50 matches. Search a street or district to narrow the list. Higher reported impacts appear first.
Toronto-TMC: The intersection blocked due to a collision
Record updated · Official restriction map ↗
Toronto-TMC: Northbound left lane is opened and right two lanes are remain blocked.
Record updated · Official restriction map ↗
Toronto-TMC: Construction of a 10-storey condominium with 4 levels of below grade parking.
Record updated · Official restriction map ↗
Toronto-TMC: Cable Chamber Roof Rebuilds
Record updated · Official restriction map ↗
Toronto-TMC: Cable Chamber Roof Rebuilds
Record updated · Official restriction map ↗
Toronto-TMC: Installation of approximately 830 m of 300 mm PVC DR18 watermain and 760 m of 600 mm welded steel watermain, including the construction of valve chambers and drain chambers, as well as associated site servicing and full surface restoration along University Avenue, from Armoury Street to College Street.
Record updated · Official restriction map ↗
Toronto-TMC: Installation of approximately 830 m of 300 mm PVC DR18 watermain and 760 m of 600 mm welded steel watermain, including the construction of valve chambers and drain chambers, as well as associated site servicing and full surface restoration along University Avenue, from Armoury Street to College Street.
Record updated · Official restriction map ↗
Toronto-TMC: Installation of approximately 830 m of 300 mm PVC DR18 watermain and 760 m of 600 mm welded steel watermain, including the construction of valve chambers and drain chambers, as well as associated site servicing and full surface restoration along University Avenue, from Armoury Street to College Street.
Record updated · Official restriction map ↗
Toronto-TMC: Installation of approximately 830 m of 300 mm PVC DR18 watermain and 760 m of 600 mm welded steel watermain, including the construction of valve chambers and drain chambers, as well as associated site servicing and full surface restoration along University Avenue, from Armoury Street to College Street.
Record updated · Official restriction map ↗
Toronto-TMC: Installation of approximately 830 m of 300 mm PVC DR18 watermain and 760 m of 600 mm welded steel watermain, including the construction of valve chambers and drain chambers, as well as associated site servicing and full surface restoration along University Avenue, from Armoury Street to College Street.
Record updated · Official restriction map ↗
Toronto-TMC: Construction Staging: Jane Portal (extension received).
Record updated · Official restriction map ↗
Toronto-TMC: Traffic staging for the Northwest corner of Scarlett and Eglinton - stage 2.
Record updated · Official restriction map ↗
Toronto-TMC: Traffic staging for the Northwest corner of Scarlett and Eglinton - stage 2.
Record updated · Official restriction map ↗
Toronto-TMC: stage 1 implementation
Record updated · Official restriction map ↗
Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.
Record updated · Official restriction map ↗
Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.
Record updated · Official restriction map ↗
Toronto-TMC: Long Duration Closure of the Parklawn Rd. North & South on ramp to the Gardiner Expressway Westbound. Closure one of the left turn lanes from the Eastbound Gardiner Expressway off ramp to Northbound Parklawn Rd.
Record updated · Official restriction map ↗
Toronto-TMC: Long Duration Closure of the Parklawn Rd. North & South on ramp to the Gardiner Expressway Westbound. Closure one of the left turn lanes from the Eastbound Gardiner Expressway off ramp to Northbound Parklawn Rd.
Record updated · Official restriction map ↗
Toronto-TMC: Long Duration Closure of the Parklawn Rd. North & South on ramp to the Gardiner Expressway Westbound. Closure one of the left turn lanes from the Eastbound Gardiner Expressway off ramp to Northbound Parklawn Rd.
Record updated · Official restriction map ↗
Toronto-TMC: Long Duration Closure of the Parklawn Rd. North & South on ramp to the Gardiner Expressway Westbound. Closure one of the left turn lanes from the Eastbound Gardiner Expressway off ramp to Northbound Parklawn Rd.
Record updated · Official restriction map ↗
Toronto-TMC: Upgrading THESL hydro infrastructure.
Record updated · Official restriction map ↗
Toronto-TMC: Upgrading THESL hydro infrastructure.
Record updated · Official restriction map ↗
Toronto-TMC: TTC Subway Vent Shaft Rehabilitation
Record updated · Official restriction map ↗
Toronto-TMC: Road Rehabilitation, Cycle Track & Sidewalk installation.
Record updated · Official restriction map ↗
Toronto-TMC: 23TW-CTS-17CWD - SANITARY FORCEMAIN INSTALLATION AT HUMBER SPS
Record updated · Official restriction map ↗
Toronto-TMC: Road Rehabilitation, Cycle Track & Sidewalk installation.
Record updated · Official restriction map ↗
Toronto-TMC: Road Rehabilitation, Cycle Track & Sidewalk installation.
Record updated · Official restriction map ↗
Toronto-TMC: Construction Staging: Mt. Dennis Portal (extension received).
Record updated · Official restriction map ↗
Toronto-TMC: Realignment of Eglinton Ave E for piling works. EEB 01 Stage 01.
Record updated · Official restriction map ↗
Toronto-TMC: The closure of the DVP On ramp from Eastern Ave is required to reconstruct a storm water management shaft within the current alignment of the DVP ramp and to construct a flood protection landform and re-build the on ramp to be incorporated into this flood protection landform.
Record updated · Official restriction map ↗
Toronto-TMC: The closure of the DVP On ramp from Eastern Ave is required to reconstruct a storm water management shaft within the current alignment of the DVP ramp and to construct a flood protection landform and re-build the on ramp to be incorporated into this flood protection landform.
Record updated · Official restriction map ↗
Toronto-TMC: Extension - JG-3/4 worksite for ATSSE project (TBM ground improvement)
Record updated · Official restriction map ↗
Toronto-TMC: Construction of a 50-storey mixed use building. Refer to the link below for construction updates: http://kscondosconstruction.com/
Record updated · Official restriction map ↗
Toronto-TMC: - The project is Underground Civil Infrastructure project. The project includes rebuilding an old vault. - The project will be executed by Entera Utility Contractors under the contract with Toronto Hydro. Cut permit have been received from City of Toronto. - Metrolinx no conflict letter has been received. - Location is 379 Adelaide St West. Construction notices has been delivered. Residents and offices around are aware of our existence on the site.
Record updated · Official restriction map ↗
Toronto-TMC: 241 CHURCH ST (TO) at DUNDAS ST E to GOULD ST Installation of 375mm Storm Sever and 2 Catch basins and 3 manholes as per MIA - Along Lane West Church St Dundas to Dundas St E
Record updated · Official restriction map ↗
Toronto-TMC: 241 CHURCH ST (TO) at DUNDAS ST E to GOULD ST Installation of 375mm Storm Sever and 2 Catch basins and 3 manholes as per MIA - Along Lane West Church St Dundas to Dundas St E
Record updated · Official restriction map ↗
Toronto-TMC: TTC Track and sewer work on College Street from Bay Street to Church Street including Yonge/College intersection
Record updated · Official restriction map ↗
Toronto-TMC: TTC Track and sewer work on College Street from Bay Street to Church Street including Yonge/College intersection
Record updated · Official restriction map ↗
Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.
Record updated · Official restriction map ↗
Toronto-TMC: Construction staging to complete mixed use tower under construction
Record updated · Official restriction map ↗
Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.
Record updated · Official restriction map ↗
Toronto-TMC: The Overhead crew will work on the curblane on both eastbound and westbound on College St and Carlton St between McCaul and Parliament between July 26 and Dec 31, 2026. This will be a rolling operation. Scope of Work In support of TTC's ongoing system-wide overhead infrastructure modernization program, the following work is planned during the College Street streetcar service closure: * Installation of the auto-tensioning system. * Adjustment of the contact wire stagger to meet TTC Engineering's full pantograph standards. * Installation of new section breaks and removal of redundant section break infrastructure. * Testing and commissioning of the upgraded Track and OCS infrastructure before the restoration of regular streetcar service.
Record updated · Official restriction map ↗
Toronto-TMC: The Overhead crew will work on the curblane on both eastbound and westbound on College St and Carlton St between McCaul and Parliament between July 26 and Dec 31, 2026. This will be a rolling operation. Scope of Work In support of TTC's ongoing system-wide overhead infrastructure modernization program, the following work is planned during the College Street streetcar service closure: * Installation of the auto-tensioning system. * Adjustment of the contact wire stagger to meet TTC Engineering's full pantograph standards. * Installation of new section breaks and removal of redundant section break infrastructure. * Testing and commissioning of the upgraded Track and OCS infrastructure before the restoration of regular streetcar service.
Record updated · Official restriction map ↗
Toronto-TMC: Working on traffic lights on eastside of intersection. Hanging overhead lights, removing traffic pole on median, as well as removing the median
Record updated · Official restriction map ↗
Toronto-TMC: Construction of utilities and a grade separation for Metrolinx. Work event is for the utility relocation and caisson portion of the work that occupies the roadway
Record updated · Official restriction map ↗
Toronto-TMC: The construction of the New Etobicoke Civic Centre. Multiplex Construction Canada will be managing the construction of the New Etobicoke Civic Centre Located at 3755 Bloor Street W. Etobicoke, Ontario M9A 1A2, located within the newly redeveloped Etobicoke Civic Centre Precinct (formerly the Westwood Theatre Lands). The ECC is a mixed-use building comprising a wide range of community focused program and services. The building is arranged in a series of tall volumes towards the north, housing the municipal offices, while the lower floors towards the south contain all the public functions. It will also be compliant to the Toronto Accessibility Design Guidelines (TADG) to extend greater accessibility for all users. With 508,000 square feet of accessible public-facing space, the new civic centre is the first of its kind to be built in the last 50 years and is designed as a state-of-the-art mixed-used civic hub that includes: Civic Square • Approximately 47,000 sq
Record updated · Official restriction map ↗
Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.
Record updated · Official restriction map ↗
Toronto-TMC: Installing watermain on Queens Park Cr. E.
Record updated · Official restriction map ↗
Toronto-TMC: Excavation, sidewalk demolition, duct bank installation, chamber installation, backfilling and sidewalk new works/reinstatement.
Record updated · Official restriction map ↗
Toronto-TMC: Traffic layout after jet grouting works at Danforth
Record updated · Official restriction map ↗
The City feed contains current and planned restrictions. Start and end dates describe a record’s overall window; intermittent work may take place only during the listed hours. An open-ended record has no end time supplied. The reported impact is the source’s assessment, not a travel-time estimate.
No. These records describe reported restrictions and planned work. They do not measure traffic speeds, queues or how long a journey will take. Check the City’s official restriction map for the source information.
A street can have separate permits, locations, directions or work periods. We retain those records so a single entry does not hide a different restriction nearby. Read the location and dates for the part of the street you will use.
City of Toronto Road Restrictions. Contains information licensed under the Open Government Licence – Toronto. The source records are filtered, sorted and formatted for this page. Things Toronto does not independently verify conditions at each location.