Toronto road restrictions

Find reported lane restrictions, construction and upcoming work before you set out.

A restriction can affect part of a road or a single lane. It does not necessarily mean the entire street is closed.

City data retrieved . The latest refresh failed; this is the last available snapshot. Reload this page for the latest available information.

“Impact reported” includes records within their start and end dates with a reported high, medium or low impact. For upcoming work, the impact filter uses the maximum impact reported for the project. Daily work hours can still vary. Always check the schedule below.

322 matching records

Reset filters

This feed is delayed or unavailable. These are saved records, not confirmation of current road conditions.

Showing the first 50 matches. Search a street or district to narrow the list. Higher reported impacts appear first.

YORKHigh reported impact

Dufferin St at Rogers Rd

Toronto-TMC: The intersection blocked due to a collision

Listed dates
→ No end supplied
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

NORTH YORKHigh reported impact

Northbound Dufferin St at Steeles Ave W

Toronto-TMC: Northbound left lane is opened and right two lanes are remain blocked.

Listed dates
→ No end supplied
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

King St W from University Ave to Peter St

Toronto-TMC: Road closed due to the TIFF.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

King St W from University Ave to Peter St

Toronto-TMC: Road closed due to the TIFF.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

King St W from University Ave to Peter St

Toronto-TMC: Road closed due to the TIFF.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

King St W from University Ave to Peter St

Toronto-TMC: Road closed due to the TIFF.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

King St W from University Ave to Peter St

Toronto-TMC: Road closed due to the TIFF.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

King St W from University Ave to Peter St

Toronto-TMC: Road closed due to the TIFF.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

NORTH YORKHigh reported impact

Leslie St at Rippleton Park Trl to 5 m North of Talwood Dr

Toronto-TMC: TTC - Bus Stops Group 23

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Dupont St 31 m West of Walmer Rd to 1 m Southwest of Kendal Ave

Toronto-TMC: 13 Storey mixed use building, with Retail/Commercial at grade, underground parking, 9 storey office tower and residential condominium.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

NORTH YORKHigh reported impact

Finch Ave W at Edithvale Dr to 15 m East of Edithvale Dr

Toronto-TMC: Bus Stop Improvements – Group 23

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Scarlett Rd at La Rose Ave to 17 m North of La Rose Ave

Toronto-TMC: TTC - Bus Stops Group 23

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Eglinton Ave W 228 m West of Islington Ave to 171 m East of Bemersyde Dr

Toronto-TMC: short term Catch Basin relocation work. Day Works

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

NORTH YORKHigh reported impact

Sheppard Ave W 57 m West of Jane St to 16 m West of Jane St

Toronto-TMC: Sanitary sewer main repair west of Jane st on the west side of Sheppard ave

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Eglinton Ave W 63 m East of Royal York Rd to 42 m West of Royal York Rd

Toronto-TMC: https://www.metrolinx.com/en/projects-and-programs/eglinton-crosstown-west-extension

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

YORKHigh reported impact

Eglinton Ave W 268 m West of Pearen St to 268 m West of Pearen St

Toronto-TMC: Construction Staging: Jane Portal (extension received).

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Eglinton Ave W at Scarlett Rd to 68 m West of Scarlett Rd

Toronto-TMC: Traffic staging for the Northwest corner of Scarlett and Eglinton - stage 2.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Eglinton Ave W 68 m West of Scarlett Rd to Scarlett Rd

Toronto-TMC: Traffic staging for the Northwest corner of Scarlett and Eglinton - stage 2.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

NORTH YORKHigh reported impact

Don Mills Rd 26 m South of Eglinton Ave E to 74 m North of Rochefort Dr

Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

SCARBOROUGHHigh reported impact

McCowan Rd 55 m South of Sheppard Ave E to 31 m South of Sheppard Ave E

Toronto-TMC: Installation of water service

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

SCARBOROUGHHigh reported impact

McCowan Rd at Channel Nine Crt to 70 m South of Channel Nine Crt

Toronto-TMC: stage 1 implementation

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

NORTH YORKHigh reported impact

Eglinton Ave E 11 m Northeast of Don Mills Rd to 27 m Northeast of Don Mills Rd

Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

NORTH YORKHigh reported impact

Eglinton Ave E 62 m Northeast of Mike Palmateer Rd to 69 m Southwest of Don Mills Rd

Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Gardiner E Park Lawn Rd Ramp 34 m Southwest of Park Lawn Rd to 12 m Southwest of Park Lawn Rd

Toronto-TMC: Long Duration Closure of the Parklawn Rd. North & South on ramp to the Gardiner Expressway Westbound. Closure one of the left turn lanes from the Eastbound Gardiner Expressway off ramp to Northbound Parklawn Rd.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Park Lawn Rd at Park Lawn Gardiner W Ramp to 5 m Northwest of Gardiner E Park Lawn Rd Ramp

Toronto-TMC: Long Duration Closure of the Parklawn Rd. North & South on ramp to the Gardiner Expressway Westbound. Closure one of the left turn lanes from the Eastbound Gardiner Expressway off ramp to Northbound Parklawn Rd.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Park Lawn Rd 11 m Northwest of Park Lawn Gardiner W Ramp to Park Lawn Gardiner W Ramp

Toronto-TMC: Long Duration Closure of the Parklawn Rd. North & South on ramp to the Gardiner Expressway Westbound. Closure one of the left turn lanes from the Eastbound Gardiner Expressway off ramp to Northbound Parklawn Rd.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Park Lawn Gardiner W Ramp 15 m Southwest of Park Lawn Rd to 80 m East of Grand Ave

Toronto-TMC: Long Duration Closure of the Parklawn Rd. North & South on ramp to the Gardiner Expressway Westbound. Closure one of the left turn lanes from the Eastbound Gardiner Expressway off ramp to Northbound Parklawn Rd.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

SCARBOROUGHHigh reported impact

McCowan Rd at Triton Rd to 39 m North of Triton Rd

Toronto-TMC: bypass plan for stage 3A

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Yonge St 7 m South of Richmond St E to 32 m South of Richmond St E

Toronto-TMC: Rehabilitate and reconstruct an existing manhole roof structure that houses active steam distribution piping. The work is required to rebuild the manhole roof, access shafts, and vent shafts while maintaining the safe operation and support of the existing steam infrastructure throughout the duration of construction.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Richmond St E 21 m East of Yonge St to 5 m East of Yonge St

Toronto-TMC: Rehabilitate and reconstruct an existing manhole roof structure that houses active steam distribution piping. The work is required to rebuild the manhole roof, access shafts, and vent shafts while maintaining the safe operation and support of the existing steam infrastructure throughout the duration of construction.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

SCARBOROUGHHigh reported impact

Danforth Rd 32 m South of Greystone Walk Dr to 21 m North of Midland Ave

Toronto-TMC: Work includes saw cut, removal of asphalt, excavation, placement of shoring boxes, installation of sewer pipes and manholes, and backfill to grade with temporary and permanent restoration

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Bloor St E 26 m West of Morley Callaghan Footbridge to 104 m East of Morley Callaghan Footbridge

Toronto-TMC: TTC Subway Vent Shaft Rehabilitation

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

NORTH YORKHigh reported impact

Jane St 24 m South of Highway 401 C E to 52 m North of Beverly Hills Dr

Toronto-TMC: Underground Utility Installation for Bell

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

EAST YORKHigh reported impact

Overlea Blvd 11 m Northeast of Millwood Rd to Millwood Rd

Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

EAST YORKHigh reported impact

Millwood Rd 14 m West of Overlea Blvd to 37 m East of Hepc

Toronto-TMC: Ontario Line Elevated Guideway and Stations: The scope of work for the contract includes: three kilometres of an elevated guideway; five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemington Park, Science Centre); and two emergency egress buildings. Additionally, there are interfaces with the Maintenance and Storage Facility; Eglinton Crosstown LRT Line 5; and other sections/contracts of the Ontario Line project.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Bathurst St 14 m North of Lennox St to Lennox St

Toronto-TMC: We will be completing some curb realignment work at the corner of Bathurst Street and Lennox Street (NW Corer), which will locally impact the sidewalk and adjacent southbound curb lane on Bathurs STreet and Westbound curb lane on Lennox Street

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Bloor St W 29 m East of Pauline Ave to 25 m West of Pauline Ave

Toronto-TMC: This is for traffic signal and sidewalk./curb work

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

SCARBOROUGHHigh reported impact

Midland Ave at Copthorne Ave to 11 m South of Steeles Ave E

Toronto-TMC: Installing new curb and sidewalks. Dates will be updated if work is completed prior to the end date.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

SCARBOROUGHHigh reported impact

Midland Ave 4 m North of Copthorne Ave to 5 m South of Duxbury Dr

Toronto-TMC: Installing new curb and sidewalks. Dates will be updated if work is completed prior to the end date.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

SCARBOROUGHHigh reported impact

Midland Ave 1 m North of Duxbury Dr to 13 m South of Steeles Ave E

Toronto-TMC: Installing new curb and sidewalks. Dates will be updated if work is completed prior to the end date.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

YORK and TORONTOHigh reported impact

Bloor St W 9 m Northwest of Riverside Dr to 6 m East of Brule Ter

Toronto-TMC: 23TW-CTS-17CWD - SANITARY FORCEMAIN INSTALLATION AT HUMBER SPS

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

St Clair Ave E at David A Balfour Park Trl to 46 m West of David A Balfour Park Trl

Toronto-TMC: Breakout and replacement of subgrade hydro network vault LOC 4460.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

YORKHigh reported impact

Eglinton Ave W 33 m East of C N R / C P R to 10 m East of Weston Rd

Toronto-TMC: Construction Staging: Mt. Dennis Portal (extension received).

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

SCARBOROUGHHigh reported impact

Eglinton Ave E 40 m West of Huntington Ave to 6 m West of Falmouth Ave

Toronto-TMC: Realignment of Eglinton Ave E for piling works. EEB 01 Stage 01.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Eastern Av E Dvp N Ramp 34 m East of Eastern Ave Diversion to 92 m South of Eastern Ave Diversion

Toronto-TMC: The closure of the DVP On ramp from Eastern Ave is required to reconstruct a storm water management shaft within the current alignment of the DVP ramp and to construct a flood protection landform and re-build the on ramp to be incorporated into this flood protection landform.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

TORONTOHigh reported impact

Eastern Ave Diversion 11 m East of Don Valley Parkway N to 22 m East of Broadview S Eastern W Ramp

Toronto-TMC: The closure of the DVP On ramp from Eastern Ave is required to reconstruct a storm water management shaft within the current alignment of the DVP ramp and to construct a flood protection landform and re-build the on ramp to be incorporated into this flood protection landform.

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

SCARBOROUGHHigh reported impact

McCowan Rd 97 m South of West Highland Creek to 18 m North of Lawrence Ave E

Toronto-TMC: Dropcurb and sidewalk under 10C

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Kipling Ave 23 m South of Eglinton Ave West Trl to 20 m North of Eglinton Ave W

Toronto-TMC: Stage transition to Stage 4B --

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

ETOBICOKEHigh reported impact

Eglinton Ave W 29 m West of Ww 1 E Kipling S Dryden to 89 m West of Kipling Ave

Toronto-TMC: Stage transition to Stage 4B --

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

SCARBOROUGHHigh reported impact

Eglinton Ave E 10 m East of Falmouth Ave to 16 m West of Brimley Rd

Toronto-TMC: Extension - JG-3/4 worksite for ATSSE project (TBM ground improvement)

Listed dates
Work period
Continuous · Everyday 00:00-23:59

Record updated · Official restriction map ↗

What these records tell you

The City feed contains current and planned restrictions. Start and end dates describe a record’s overall window; intermittent work may take place only during the listed hours. An open-ended record has no end time supplied. The reported impact is the source’s assessment, not a travel-time estimate.

Is this a live traffic map?

No. These records describe reported restrictions and planned work. They do not measure traffic speeds, queues or how long a journey will take. Check the City’s official restriction map for the source information.

Why can a street appear more than once?

A street can have separate permits, locations, directions or work periods. We retain those records so a single entry does not hide a different restriction nearby. Read the location and dates for the part of the street you will use.

Road data source

City of Toronto Road Restrictions. Contains information licensed under the Open Government Licence – Toronto. The source records are filtered, sorted and formatted for this page. Things Toronto does not independently verify conditions at each location.

Find your next Toronto stop

A few places to start

Browse all guides & city tools